Perancangan Sistem Informasi Manajemen Biaya Proyek Menggunakan Metode Earned Value Management pada PT. Kaltacitra Utama Berbasis Web
DOI:
https://doi.org/10.59039/ekstensi.v1i3.17Keywords:
Project Cost Management, Earned Value Management (EVM), Web-Based Information System, Management Efficiency, Construction IndustryAbstract
The effectiveness of project cost management has become a primary concern in the construction industry. Traditional constraints in project cost monitoring necessitate a solution to enhance efficiency, transparency, and accuracy in management. This research aims to introduce a web-based project cost management information system that focuses on the application of the Earned Value Management (EVM) method. By employing a web-based system development approach using the Earned Value Management (EVM) method to accurately monitor project costs and performance. The utilization of web technology enables real-time access for stakeholders, facilitating more timely monitoring and evaluation. The implementation of this system has made a positive contribution to project cost management at PT. Kalta Citra Utama. Testing conducted demonstrates increased real-time transparency and accuracy in project cost information, providing better support for managerial decision-making. Implementing a web-based project cost management information system with the Earned Value Management (EVM) method at PT. Kalta Citra Utama will prove to enhance the efficiency and accuracy of project cost management. This demonstrates significant potential in optimizing project management practices in the construction industry.
Downloads
References
H. R. Suharno, N. Gunantara, dan M. Sudarma, “Analisis penerapan metode scrum pada sistem informasi manajemen proyek dalam industri & organisasi digital,” Maj. Ilm. Teknol. Elektro, vol. 19, no. 2, hal. 203, 2020.
A. Abdurrasyid, L. Luqman, A. Haris, dan I. Indrianto, “Implementasi metode PERT dan CPM pada sistem informasi manajemen proyek pembangunan kapal,” Khazanah Inform. J. Ilmu Komput. dan Inform., vol. 5, no. 1, hal. 28–36, 2019.
P. A. de Andrade, A. Martens, dan M. Vanhoucke, “Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities,” Autom. Constr., vol. 99, hal. 68–78, 2019.
R. R. Venkataraman dan J. K. Pinto, Cost and value management in projects. John Wiley & Sons, 2023.
N. Cho, M. El Asmar, G. E. Gibson Jr, dan V. Aramali, “Earned value management system (EVMS) reliability: A review of existing EVMS literature,” in Construction Research Congress 2020, 2020, hal. 631–639.
A. Mahmoudi, M. Bagherpour, dan S. A. Javed, “Grey earned value management: theory and applications,” IEEE Trans. Eng. Manag., vol. 68, no. 6, hal. 1703–1721, 2019.
B. Koke dan R. C. Moehler, “Earned Green Value management for project management: A systematic review,” J. Clean. Prod., vol. 230, hal. 180–197, 2019.
A. Miguel, W. Madria, dan R. Polancos, “Project management model: Integrating earned schedule, quality, and risk in earned value management,” in 2019 IEEE 6th International Conference on Industrial Engineering and Applications (ICIEA), 2019, hal. 622–628.
J. T. Netto, N. L. F. de Oliveira, A. P. A. Freitas, dan J. A. N. dos Santos, “Critical factors and benefits in the use of earned value management in construction,” Brazilian J. Oper. & Prod. Manag., vol. 17, no. 1, hal. 1–10, 2020.
Nugroho, F., & Bani, A. U. (2023). Pemahaman Dasar Metodologi Penelitian (1st ed.). Deepublish.
L. M. Naeni, S. Shadrokh, dan A. Salehipour, “A fuzzy approach for the earned value management,” Int. J. Proj. Manag., vol. 29, no. 6, hal. 764–772, 2011.
Q. W. Fleming dan J. M. Koppelman, “Earned value management,” Cost Eng., vol. 44, no. 9, hal. 32–36, 2002.
H. L. Chen, W. T. Chen, dan Y. L. Lin, “Earned value project management: Improving the predictive power of planned value,” Int. J. Proj. Manag., vol. 34, no. 1, hal. 22–29, 2016.
K. Henderson dan W. Lipke, “Earned schedule: An emerging enhancement to earned value management,” Cross Talk, J. Def. Softw. Eng., hal. 26–30, 2006.
D. S. Christensen, “The costs and benefits of the earned value management process,” J. Parametr., vol. 18, no. 2, hal. 1–16, 1998.
W. Lipke, O. Zwikael, K. Henderson, dan F. Anbari, “Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes,” Int. J. Proj. Manag., vol. 27, no. 4, hal. 400–407, 2009.
M. Vanhoucke dan P. de Koning, “Stability of Earned Value Management-Do project characteristics influence the stability moment of the cost and schedule performance index,” J. Mod. Proj. Manag., vol. 4, no. 1, hal. 185, 2016.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Dandy Syahputra, Iskandar Zulkarnain, Samuel Ramos

This work is licensed under a Creative Commons Attribution 4.0 International License.